How to eliminate material wastage with simple best practice measures?

Date: 16 May, 2018

The key aspects to be considered for a solution are:

– Need for a simple application to control material wastage
– Curb wastage to boost the overall production of the plant substantially
– Eliminate potential dust and choking hazards along with environmental issues
– A proper solution at an elementary level which will have a lasting impact

The solutions derived for above pain points while ensuring optimal material usage:

In a Readymix plant when the silo gets filled through bulker it has a propensity to overflow. This has a domino effect that results in

– Dust choked filter pipelines
– Material wastage of one to two per cent of total loaded materials
– Reduced overall production volume of the respective plant

This dusting additionally leads to environmental concerns and challenges from neighbours w.r.t. choking hazards.
To handle this issue, RMX Tuticorin plant has devised a simple yet effective solution – a cut off system in silo. By installing this silo filling cut off system, the optimum material input is used without wastage in an odd scenario of overflow thereby removing all the concerns faced by the plant at its preliminary level. Problems always have simple solutions. The trick lies in knowing the process inside out.

Know more about the best practices by our cement plants here

Nuvoco Vistas Corp. Ltd.

Nuvoco Vistas Corp. Ltd, a Nirma Group company, started operations in India in 1999 via acquisitions. Nirma Group forayed into the cement business in 2014 through a greenfield cement plant in Nimbol. Thereafter, we have grown the cement business, through acquisition of the Indian cement business of LafargeHolcim in 2016 and NU Vista (formerly Emami Cement Limited) in 2020. Read More

Blog

14
Jun
2021

Have you ever noticed the p...

READ MORE
26
May
2021

With the ever-increasing po...

READ MORE
11
May
2021

“What is concrete used for?...

READ MORE
Read all Blogs