The key aspects to be considered for a solution are:

– Need for a simple application to control material wastage
– Curb wastage to boost the overall production of the plant substantially
– Eliminate potential dust and choking hazards along with environmental issues
– A proper solution at an elementary level which will have a lasting impact

The solutions derived for above pain points while ensuring optimal material usage:

In a Readymix plant when the silo gets filled through bulker it has a propensity to overflow. This has a domino effect that results in

– Dust choked filter pipelines
– Material wastage of one to two per cent of total loaded materials
– Reduced overall production volume of the respective plant

This dusting additionally leads to environmental concerns and challenges from neighbours w.r.t. choking hazards.
To handle this issue, RMX Tuticorin plant has devised a simple yet effective solution – a cut off system in silo. By installing this silo filling cut off system, the optimum material input is used without wastage in an odd scenario of overflow thereby removing all the concerns faced by the plant at its preliminary level. Problems always have simple solutions. The trick lies in knowing the process inside out.

Know more about the best practices by our cement plants here

Nuvoco Vistas Corp. Ltd.

Nuvoco Vistas Corp. Ltd. (formerly Lafarge India Limited) has been a part of the Indian construction landscape since 1999; through its cement business. We currently have six cement and close to sixty five ready mix concrete plants in India. We have an established presence across all major cities and towns in India. Our operations across two business divisions

Read More

Blog

24
Oct
2018

The World One Towers is a 4...

READ MORE
17
Oct
2018

This landmark temple in Raj...

READ MORE
10
Oct
2018

A project that stands proud...

READ MORE
Read all Blogs